CONSTRUCTION PACKAGES

Four specification levels for early budgeting and client comparison.

Package rates are starting planning rates. A final project quotation is issued after drawings, structure, soil/site conditions, location, brands, allowances and scope are reviewed.

Choose your construction level

Use these four packages to understand finish and specification positioning before a detailed BOQ is prepared.

ESSENTIAL

Essential

Starting from₹1,799/ sq.ft.
  • Standard RCC & masonry specification
  • Reliable branded core materials
  • Standard electrical & plumbing
  • Functional flooring & finishes
  • Project coordination
LUXURY

Luxury

Starting from₹2,699/ sq.ft.
  • Premium material selections
  • Luxury flooring & bathroom allowance
  • Designer lighting readiness
  • Premium doors, windows & finishes
  • Detailed approval workflow
SIGNATURE

Signature

Starting from₹3,299+/ sq.ft.
  • Custom luxury specification
  • High-end façade and interior coordination
  • Premium imported / bespoke options
  • Advanced systems readiness
  • Dedicated project experience

Package specification comparison

The final signed BOQ should contain exact brand/model/allowance values. This table explains the package hierarchy.

ScopeEssentialPremiumLuxurySignature
StructureStandard RCC as per approved designRCC with upgraded quality controlsPremium project-specific RCC controlsCustom structural coordination
Cement & SteelApproved branded optionsPremium approved brandsPremium brand selectionProject-specific premium selection
FlooringFunctional tile allowanceUpgraded tile allowancePremium tile/stone allowanceLuxury/imported/natural stone options
Sanitary & CPStandard branded rangePremium branded rangeLuxury branded rangeHigh-end/designer range
ElectricalStandard modular rangeEnhanced points and brandsPremium switches/lighting readinessAutomation-ready bespoke planning
PlumbingStandard branded pipingUpgraded plumbing packagePremium plumbing coordinationSpecialised systems as designed
Doors & WindowsStandard allowanceUpgraded finish allowancePremium profiles and hardwareBespoke/high-performance systems
Paint & FinishesStandard finish systemPremium paint systemLuxury finish allowanceDesigner/custom finish scope
ReportingMilestone updatesStructured milestone reportingDetailed approvals/reportingDedicated premium project experience

What is usually included?

Foundation, RCC and masonry as per approved project design.
Waterproofing, plaster and core civil finishing as defined in BOQ.
Electrical and plumbing systems within package specifications.
Flooring, sanitary, doors/windows and paint within package allowances.
Project coordination, stage checks and client approvals.

What may be additional?

+Special foundation, basement or soil-condition-related works beyond base assumption.
+Lift, automation devices, loose furniture, landscaping, borewell and solar systems unless quoted.
+Government approval fees, utility deposits and third-party statutory charges.
+Selections above agreed material allowances and post-approval design changes.
Can the package be customised?

Yes. The package is a starting framework. Material brands, allowances and scope can be upgraded or adjusted before the project-specific BOQ is frozen.

Does ₹2,199/sq.ft. mean every project will cost exactly that?

No. It is a starting planning rate. Final pricing depends on drawings, floor count, structural design, site condition, city, access, selections and final scope.

How do I know exactly what is included?

Before contract signing, request the detailed package BOQ/specification schedule. It should list the actual item, brand/equivalent, allowance, unit and exclusions.

Want the detailed BOQ for a package based on your built-up area?