Essential
- Standard RCC & masonry specification
- Reliable branded core materials
- Standard electrical & plumbing
- Functional flooring & finishes
- Project coordination
CONSTRUCTION PACKAGES
Package rates are starting planning rates. A final project quotation is issued after drawings, structure, soil/site conditions, location, brands, allowances and scope are reviewed.
Use these four packages to understand finish and specification positioning before a detailed BOQ is prepared.
The final signed BOQ should contain exact brand/model/allowance values. This table explains the package hierarchy.
| Scope | Essential | Premium | Luxury | Signature |
|---|---|---|---|---|
| Structure | Standard RCC as per approved design | RCC with upgraded quality controls | Premium project-specific RCC controls | Custom structural coordination |
| Cement & Steel | Approved branded options | Premium approved brands | Premium brand selection | Project-specific premium selection |
| Flooring | Functional tile allowance | Upgraded tile allowance | Premium tile/stone allowance | Luxury/imported/natural stone options |
| Sanitary & CP | Standard branded range | Premium branded range | Luxury branded range | High-end/designer range |
| Electrical | Standard modular range | Enhanced points and brands | Premium switches/lighting readiness | Automation-ready bespoke planning |
| Plumbing | Standard branded piping | Upgraded plumbing package | Premium plumbing coordination | Specialised systems as designed |
| Doors & Windows | Standard allowance | Upgraded finish allowance | Premium profiles and hardware | Bespoke/high-performance systems |
| Paint & Finishes | Standard finish system | Premium paint system | Luxury finish allowance | Designer/custom finish scope |
| Reporting | Milestone updates | Structured milestone reporting | Detailed approvals/reporting | Dedicated premium project experience |
Yes. The package is a starting framework. Material brands, allowances and scope can be upgraded or adjusted before the project-specific BOQ is frozen.
No. It is a starting planning rate. Final pricing depends on drawings, floor count, structural design, site condition, city, access, selections and final scope.
Before contract signing, request the detailed package BOQ/specification schedule. It should list the actual item, brand/equivalent, allowance, unit and exclusions.