CONSTRUCTION PACKAGES

Four specification levels for early budgeting and client comparison.

Package rates are starting planning rates. A final project quotation is issued after drawings, structure, soil/site conditions, location, brands, allowances and scope are reviewed.

Choose your construction level

Use these four packages to understand finish and specification positioning before a detailed BOQ is prepared.

ESSENTIAL

Essential

Starting from₹1,799/ sq.ft.
  • Standard RCC & masonry specification
  • Reliable branded core materials
  • Standard electrical & plumbing
  • Functional flooring & finishes
  • Project coordination
LUXURY

Luxury

Starting from₹2,699/ sq.ft.
  • Premium material selections
  • Luxury flooring & bathroom allowance
  • Designer lighting readiness
  • Premium doors, windows & finishes
  • Detailed approval workflow
SIGNATURE

Signature

Starting from₹3,299+/ sq.ft.
  • Custom luxury specification
  • High-end façade and interior coordination
  • Premium imported / bespoke options
  • Advanced systems readiness
  • Dedicated project experience

Package specification comparison

The final signed BOQ should contain exact brand/model/allowance values. This table explains the package hierarchy.

ScopeEssentialPremiumLuxurySignature
StructureStandard RCC as per approved designRCC with upgraded quality controlsPremium project-specific RCC controlsCustom structural coordination
Cement & SteelApproved branded optionsPremium approved brandsPremium brand selectionProject-specific premium selection
FlooringFunctional tile allowanceUpgraded tile allowancePremium tile/stone allowanceLuxury/imported/natural stone options
Sanitary & CPStandard branded rangePremium branded rangeLuxury branded rangeHigh-end/designer range
ElectricalStandard modular rangeEnhanced points and brandsPremium switches/lighting readinessAutomation-ready bespoke planning
PlumbingStandard branded pipingUpgraded plumbing packagePremium plumbing coordinationSpecialised systems as designed
Doors & WindowsStandard allowanceUpgraded finish allowancePremium profiles and hardwareBespoke/high-performance systems
Paint & FinishesStandard finish systemPremium paint systemLuxury finish allowanceDesigner/custom finish scope
ReportingMilestone updatesStructured milestone reportingDetailed approvals/reportingDedicated premium project experience

What is usually included?

✓Foundation, RCC and masonry as per approved project design.
✓Waterproofing, plaster and core civil finishing as defined in BOQ.
✓Electrical and plumbing systems within package specifications.
✓Flooring, sanitary, doors/windows and paint within package allowances.
✓Project coordination, stage checks and client approvals.

What may be additional?

+Special foundation, basement or soil-condition-related works beyond base assumption.
+Lift, automation devices, loose furniture, landscaping, borewell and solar systems unless quoted.
+Government approval fees, utility deposits and third-party statutory charges.
+Selections above agreed material allowances and post-approval design changes.
Can the package be customised?

Yes. The package is a starting framework. Material brands, allowances and scope can be upgraded or adjusted before the project-specific BOQ is frozen.

Does ₹2,199/sq.ft. mean every project will cost exactly that?

No. It is a starting planning rate. Final pricing depends on drawings, floor count, structural design, site condition, city, access, selections and final scope.

How do I know exactly what is included?

Before contract signing, request the detailed package BOQ/specification schedule. It should list the actual item, brand/equivalent, allowance, unit and exclusions.

Want the detailed BOQ for a package based on your built-up area?